top of page

Anza Trail
Tumacácori to Tubac Section

TEST SITE - WORK IN PROGRESS

LogoTransparent.png

Operations and Maintenance

Two tires were moved off to the side of trail.

Image description below

The transition from park land to private land with a gate.

Image description below

A maintenance worker paints the park’s restroom door.

Image description below

Park staff plant new Spring plants.

Image description below

An example of trail maintenance to remove a large fallen log.

Image description below

A log rolled to the side of the trail.

Image description below

A maintenance worker in the park with a vehicle and shovel.

Image description below

Image description below

Copyright © 2024-2026 Tucson AccessTrails. All rights reserved.

Copyright © 2024-2026 Tucson AccessTrails. All rights reserved.

bottom of page